Sl.No. Name and Address of STP Year of Commissioning City/ Town / District Installed Capacity (MLD) Utilized Capacity (MLD) Technology/  process STP based Hotel/Ashram/
Authority/Local Urban body/other institutions responsible for O&M of STP
Date  pH BOD  (mg/l) COD  (mg/l) TSS (mg/l) TC (MPN/100ml) FC (MPN/100ml)  Achieving/ Not Achieving (As per MOEFCC notification dated 13.10.2017)  Mode of disposal of treated sewage and sludge Name of treated sewage receiving water body Drain/Sub-Tributary/Tributary/River Ganga Name of river catchment in which STP is located (tributary of river Ganga/river Ganga) Ganga Phase
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20 21
1 10.445 MLD STP near Tixi Tempel (Karanpur) 2001 Etawah 10.445 10.445 WSP UPJN(R)  21.08.2023 7.80 27.0 176.0 37.0 28000 820 Achieving ---- Jharana Nala River Yamuna  Phase-II
2 Etawah 21 MLD 2022 Etawah 21 21 SBR UPJN(R)  21.08.2023 7.40 10.0 40.0 9.0 17000 370 Achieving Disposed in river Yamuna ---- River Yamuna  Phase-II
3 13.5 MLD STP at Mauja Umrain 2013 Etawah 13.5 3.0 WSP UPJN(R)  21.08.2023 7.60 24.0 152.0 35.0 24000 780 Achieving On Land Sludge-In Agriculture On Land River Yamuna  Phase-II
4 03 MLD STP Firozabad  2014 Firozabad  3 3 UASB Jal Kal  21.08.2023 7.70 25.0 168.0 42.0 35000 1000 Not Achieving ---- As per Jal Kal Vibhag nagar nigam infromation approx -3MLD treated sewage is used by horiculture department for irrigation of Plantation/ trees  Phase-II
5 67 MLD Mohammadpur,  Biharipur 2020 Firozabad 67 52 ASP+ extended   aeration  UPJN(U) 21.08.2023 7.60 9.0 112.0 10.0 22000 450 Achieving ---- ---- River Yamuna Phase-II
6 1.65 MLD Saifai 2013 Etawah 1.65 0.9 SBR UPJN(U) 24.08.2023 7.50 28.0 200.0 53.0 35000 930 Achieving River Sengar  Treated sewage is  used for plantation    Phase-II
7 23 MLD STP at Mauja Odenya, Padaria 2014 Mainpuri 23.0 11.0 UASB  UPJN(U) 24.08.2023 7.60 26.0 184.0 33.0 28000 820 Achieving Through Drain  Kharja Drain Ishan River / River Ganga Phase-II
8 26 MLD Jhansi Laxmi Taal 2021 Jhansi 26 22 SBR UPJN(U) 03.08.2023 7.60 8.0 22.0 17.0 2100 610 Achieving ---- ---- ---- ----
9 3.42 MLD Near Divyang  kendra 2000 Chitrakoot 3.42 3.42 Oxidation Pond  Nagar Palika Parishad 23.08.2023 7.67 22.0 156.0 64.0 350000 94000 Not Achieving ---- Lowland area Lowland area to River Mandakini Phase-II
10  42 MLD, Sajari          Kanpur 2016-17 Kanpur 42 21 ASP UPJN(R)  22.08.2023 7.96 24.0 120.0 46.0 310 170 Achieving Disposal Channel River Pandu  Tributary of   River Ganga  Phase-I
11    210 MLD, Bingawan Kanpur 2015-16 Kanpur 210 135 UASB UPJN(R)  22.08.2023 7.59 42.0 220.0 62.0 160000 110000 Not Achieving Disposal Channel River Pandu  Tributary of   River Ganga  Phase-I
12    5 MLD, Jajmau         Kanpur  1989-90 Kanpur 5 5 UASB UPJN(U) 21.08.2023 7.29 45.0 190.0 62.0 130000 78000 Not Achieving Irrigation Irrigation Channel River Ganga Phase-I
13  43 MLD Jajmau,  Kanpur 2020 Kanpur 43 37 ASP UPJN(R)  21.08.2023 7.60 24.0 120.0 38.0 94000 70000 Not Achieving Irrigation Irrigation Channel River Ganga Phase-I
14 130 MLD Jajmau, Kanpur   1998-99 Kanpur 130 120 ASP UPJN(R)  21.08.2023 7.49 25.5 140.0 44.0 130000 79000 Not Achieving Irrigation Irrigation Channel River Ganga Phase-I
15 2.7 MLD Fatehgarh
 STP
1992-93 Farrukhabad 2.7 2.7 WSP UPJN(U) 22.08.2023 7.92 24.0 120.0 61.0 130000 70000 Not Achieving - Irrigation/river ganga River Ganga Phase-I
16 13 MLD Jalalpur,  Amrapur, Kannuaj 2017 Kanpur Dehat 13 13 SBR UPJN(U) 16.08.2023 7.90 39.0 160.0 76.0 120000 78000 Not Achieving Disposal Channel  River Kali (East)  Tributary of   River Ganga  Phase-I
17 50 MLD STP Numayadahi 2013 Prayagraj 50 50 Bio-tower UPJN(R)  15.08.2023 7.29 20.0 48.0 32.0 17000 680 Achieving Disposed to river Yamuna through drain. Dried sludge is used as organic manure / Landfill. River Yamuna  River Yamuna  Phase-II
18 10 MLD STP Ponghat 2013 Prayagraj 10 10 Bio-tower UPJN(R)  15.08.2023 7.31 22.0 44.0 28.0 7900 400 Achieving River Ganga River Ganga Phase-II
19 25 MLD STP Kodra 2013 Prayagraj 25 25 Bio-tower UPJN(R)  15.08.2023 7.22 20.0 52.0 30.0 14000 450 Achieving River Ganga River Ganga Phase-II
20  60 MLD STP Rajapur  2013 Prayagraj 60 60 UASB UPJN(R)  15.08.2023 7.26 28.0 84.0 54.0 24000 680 Achieving River Ganga River Ganga Phase-II
21 29 MLD STP Salori-1 2007 Prayagraj 29 29 FAB UPJN(R)  15.08.2023 7.29 26.0 80.0 46.0 35000 920 Achieving River Ganga River Ganga Phase-II
22 14 MLD STP Salori-2   Expansion 2016 Prayagraj 14 14 SBR UPJN(U) 15.08.2023 7.17 8.0 24.0 10.0 8400 400 Achieving River Ganga River Ganga Phase-II
23 20 MLD STP Naini 2013 Prayagraj 80 80
(60+20)
ASP UPJN(R)  15.08.2023 7.21 24.0 76.0 40.0 24000 680 Achieving Partially used for Irrigation. Disposed to RiverYamuna through drain. Dried sludge is used as organic manure / Landfill. River Yamuna River Yamuna Phase-II
24 60 MLD STP Naini 1999 15.08.2023 7.21 24.0 76.0 40.0 24000 680 Achieving River Yamuna River Yamuna Phase-II
25 42 MLD STP
Naini
2023 Prayagraj 42 36 FCR UPJN(R)  15.08.2023 7.35 22.0 56.0 28.0 22000 680 Achieving   River Ganga River Ganga  
26 14 MLD STP Phaphamau 2023 Prayagraj 14 14 FCR UPJN(R)  15.08.2023 7.16 18.0 36.0 20.0 9400 400 Achieving   River Ganga River Ganga  
27  80 MLD Dinapur STP 1994 Varanasi 80 67.77 ASP UPJN(U) 16.08.2023 7.55 27.0 134.0 84.0 430 140 Achieving Disposal to Ganga/ Manure River Ganga River Ganga Phase-II
28 10 MLD Ramnagar 15.03.21 Varanasi 10 9.5 Anaerobic Anoxic Oxic UPJN(R)  16.08.2023 7.68 8.0 40.0 9.0 220 110 Achieving ---- ---- River Ganga Phase-II
29  9.8 MLD Bhagwanpur STP 1989 Varanasi 9.8 9.8 ASP UPJN(R)  16.08.2023 7.57 28.0 136.0 82.0 430 170 Achieving ---- River Ganga River Ganga/Assi Phase-II
30 140 MLD Dinapur STP  11.11.2018 Varanasi 140 99.5 ASP UPJN(U) 16.08.2023 7.63 18.0 48.0 28.0 240 130 Achieving ---- River Varuna River Ganga/ Varuna Phase-II
31 120 MLD Goithaha STP  19.02.2019 Varanasi 120 40 SBR UPJN(U) 16.08.2023 7.68 8.0 38.0 9.0 350 170 Achieving Irrigation / Landfill Chandpur irrigation canal River Varuna Phase-II
32 Jaunpur      2023 Jaunpur 30 30 SBR UPJN(R)  24.08.2023 7.58 7.8 30.4 12.0 330 170 Achieving ----   River Ganga Phase-II
33 07 MLD Vindyachal Mirzapur 2022 Mirzapur  7 3.23 SBR UPJN(U) 14.08.2023 7.66 8.0 36.0 9.0 280 130 Achieving Drain River Ganga River Ganga Phase-II
34 14 MLD Pakka Pokhra 1994 Mirzapur 14 14 UASB UPJN(R)  14.08.2023 7.53 27.0 142.0 84.0 31000 21000 Not Achieving ---- River Ganga River Ganga Phase-II
35 15 MLD S.T.P.  Jharkhandi, Maherwa ki Bari 01.06.2015 Gorakhpur 15 11.89 SBR UPJN(U) 22.08.2023 7.43 24.5 76.0 42.0 2400 1000 Not Achieving Drain River Ganga  River Ganga  Phase-II
36 30 MLD S.T.P.  Opp. Manyavar Kanshiram Shahri Garib Awas Yojna, Deoria bypass Road 01.02.2015 Gorakhpur 30 19.83 SBR UPJN(U) 22.08.2023 7.13 22.0 72.0 40.0 2200 930 Achieving Drain River Ganga  River Ganga  Phase-II
37 38 MLD STP, Mahilpur Road 1998 Saharanpur 38 38 UASB UPJN(U) 16.08.2023 6.70 25.0 184.0 45.0 690 430 Achieving Treated Sewage discharge in to Dhamola river sludge sale  to farmers  Dhomala river  Hindon river to Yamuna river  Phase-II
38 6.5 MLD Awas vikas Parishad STP 2018 Lucknow 6.5 6.5 SBR Jal Kal  14.08.2023 7.42 16.0 85.20 42.0 3300 610 Achieving Public drain River Gomti  River Gomti  Phase-II
39 37.5 MLD Awas vikas Parishad STP 2017 Lucknow 37.5 37.5 SBR U.P. Awas vikas Parishad  14.08.2023 7.49 15.8 90.80 44.0 3900 780 Achieving Public drain River Gomti  River Gomti  Phase-II
40 345 MLD STP, Bharwara  2011 Lucknow 345 345 UASB  UPJN(U) 14.08.2023 7.27 17.1 97.20 46.0 33000 6800 Not Achieving Gomti River Fertilizer Manure   River Gomti  River Gomti  Phase-II
41 56 MLD STP, Daulatganj 2002 Lucknow 56 42+14 FAB  UPJN(U) 14.08.2023 7.28 16.2 93.60 42.0 2800 700 Achieving River Gomti  River Gomti  Phase-II
42 2011 14.08.2023 7.28 16.2 93.60 42.0 2800 700 Achieving
43 56 MLD  Trans Hindon (Indirapuram), Ghaziabad 2000 Ghaziabad 56 56 UASB UPJN(U) 24.08.2023 7.34 20.0 62.0 26.0 3800000 2600000 Not Achieving ---- River Hindon River Hindon Phase-II
44 30 MLD,  Sadullabad (Loni), Ghaziabad  2012 Ghaziabad 30 20 MBBR UPJN(U) 22.08.2023 7.20 7.0 47.0 9.0 7000 930 Achieving ---- River Hindon River Hindon Phase-II
45 74 MLD S.B.R., Indirapuram, Ghaziabad 2013 Ghaziabad 74 74 SBR UPJN(U) 24.08.2023 7.18 6.0 47.0 7.0 3400 780 Achieving ---- River Hindon River Hindon Phase-II
46 56 MLD S.B.R., Bapudham, Ghaziabad  2014 Ghaziabad 56 56 SBR GDA 22.08.2023 7.04 7.0 51.0 9.0 1500 200 Achieving ---- River Hindon River Hindon Phase-II
47 6 MLD STP Garh Zone, Garhmukeshwar Hapur 2011 Hapur / Garhmukteswar 6 6 UASB followed by extended aeration  UPJN(R)  07.08.2023 7.50 6.0 40.0 8.0 3400 680 Achieving ---- Garh Sub-distibutaory of River Ganga Garh Catchment Area Phase-I
48 3 MLD STP Brijghat Zone, Garhmukeshwar Hapur 2011 Hapur / Garhmukteswar 3 3 UASB followed by extended aeration  UPJN(R)  07.08.2023 7.42 7.0 40.0 10.0 2100 610 Achieving ---- Brijghat Sub-distibutaory of River Ganga River Ganga (Brijghat Area) Phase-I
49 56 MLD,  Indirapuram, (GDA), Ghaziabad 2012 Ghaziabad 56 56 SBR Nagar Nigam 24.08.2023 7.06 5.0 30.0 6.0 2800 790 Achieving ---- River Hindon River Hindon Phase-II
50 56 MLD  S.B.R., Dudahaida Vijay Nagar, Ghaziabad 2013 Ghaziabad 56 56 SBR UPJN(U) 22.08.2023 7.08 9.0 44.0 10.0 4100 680 Achieving Dasna drain River Hindon River Hindon Phase-II
51 70 MLD U.A.S.B.R. Dudahaida Vijay Nagar, Ghaziabad 2000 Ghaziabad 70 70 UASB UPJN(U) 22.08.2023 7.03 24.0 68.0 34.0 4800000 3400000 Not Achieving Dasna drain River Hindon River Hindon Phase-II
52 3 MLD Pilkhaun 2015 Ghaziabad 3 3 MBBR UPJN(U) 21.08.2023 6.94 16.0 41.0 38.0 3300 920 Achieving ---- Kadrabad drain  River kali/ River Ganga Phase-II
53 56 MLD S.B.R.  Govindpuram, Ghaziabad  2014 Ghaziabad 56 56 SBR GDA 22.08.2023 7.20 7.0 48.0 10.0 2100 450 Achieving Dasna drain River Hindon River Hindon Phase-II
54 20 MLD  Modinagar 2023 Modinagar, Ghaziabad 20 12 SBR UPJN(U) 08.08.2023 7.26 8.0 59.0 10.0 2700 1300 Not Achieving Kadrabad Drain  Kali (East) River Ganga   
55 56 MLD S.B.R., Morty, Ghaziabad 2018 Ghaziabad 56 56 SBR GDA 22.08.2023 7.38 6.0 50.0 8.0 2700 400 Achieving ---- River Hindon River Hindon Phase-II
56 30 MLD Hapur 2022 Hapur, Ghaziabad 30 9 SBR UPJN(U) 07.08.2023 7.2 6.0 46.0 9.0 2500 680 Achieving Hapur Drain Kali (East) River Ganga  ----
57 78 MLD Dhadhupura, Agra 2013 Agra 78 78 UASB UPJN(U) 18.08.2023 7.97 26.0 152.0 40.0 4300 910 Achieving Agriculture
(on land)
On Land Onland Phase-II
58 2.25 MLD Budi ka Nagla, Agra 2000 Agra 2.25 2.25 WSP UPJN(U) 18.08.2023 7.82 28.0 144.0 42.0 4600 920 Achieving River Yamuna  River Yamuna  Irrigation/River Yamuna  Phase-II
59 10 MLD Peelakhar, Agra  2000 Agra 10 10 WSP UPJN(U) 18.08.2023 7.96 29.0 152.0 48.0 3800 820 Achieving ---- River Yamuna  Irrigation/River Yamuna  Phase-II
60 12 MLD Devri Road, (Bhimnagri), Agra  2011 Agra 12 8 UASB UPJN(U) 18.08.2023 7.80 26.0 136.0 38.0 3300 680 Achieving River Yamuna  River Yamuna  River Yamuna  Phase-II
61 14 MLD Jaganpur, Sikandarpur, Agra  2011 Agra 14 14 UASB UPJN(U) 18.08.2023 8.04 26.0 128.0 42.0 3800 820 Achieving Agriculture
(on land)
On Land Onland Phase-II
62 40 MLD Sadarban, Bichhpuri, Agra 2013 Agra 40 28.5 UASB UPJN(U) 18.08.2023 7.90 27.0 120.0 36.0 2100 780 Achieving River Yamuna  River Yamuna  River Yamuna  Phase-II
63 36 MLD Sadarwan
(Bichpuri)  New 
2018 Agra 36 36 SBR ADA 18.08.2023 7.85 26.0 128.0 46.0 4600 920 Achieving Land/ Agra canal  Land/ Agra canal  Phase-II
64 24 MLD Dhadhupura (New), Agra 2014 Agra 24 15 UASB UPJN(U) 18.08.2023 8.03 23.0 112.0 38.0 2400 930 Achieving Agriculture
(on land)
On Land Onland Phase-II
65 4.50 MLD Kalindi Vihar, Agra  2014 Agra 4.5 4.5 UASB ADA 18.08.2023 7.88 28.0 144.0 48.0 4300 910 Achieving Karwan River  Karwan River  River Yamuna  Phase-II
66 03 MLD Pandav Nagar, Meerut                                  2013 Meerut  3 2.7 ASP MDA 28.08.2023 7.36 17.0 164.0 53.0 4600 3400 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
67 07 MLD Pallavpuram-1, Meerut  2012 Meerut  7 6.5 ASP MDA 28.08.2023 7.39 16.0 156.0 47.0 4300 3400 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
68 7 MLD Pallavpuram-2, Meerut  2008 Meerut  11 7 MBBR MDA 28.08.2023 7.51 22.0 184.0 64.0 6300 4800 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
69 06 MLD Rakshapuram, Meerut  2011 Meerut  6 4.4 ASP MDA 28.08.2023 7.47 15.0 152.0 57.0 3900 3100 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
70 10 MLD Lohiya Nagar, Meerut  2010 Meerut  10 2 ASP MDA 28.08.2023 7.6 20.0 172.0 72.0 4700 3900 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
71 15 MLD Shatabdinagar, Meerut  2010 Meerut  15 4.8 ASP MDA 28.08.2023 7.51 17.0 160.0 48.0 4900 4000 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
72 15 MLD Vedvyaspuri Meerut  2010 Meerut  15 4.5 ASP MDA 28.08.2023 7.41 15.0 148.0 63.0 3900 3200 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
73 06 MLD Shradhapuri-1, Meerut  2010 Meerut  6 5.5 ASP MDA 28.08.2023 7.63 16.0 156.0 63.0 4000 3200 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
74 06 MLD Sainik Vihar 2017 Meerut  6 5.95 UASB MDA 28.08.2023 7.52 18.0 168.0 57.0 4300 3200 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
75 5 MLD Modipuram Tiraha 2016 Meerut  5 4.9 ASP MDA  28.08.2023 7.57 22.0 172.0 76.0 5800 4000 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
76 07 MLD Sports Goods Complex, Meerut  2012 Meerut  7 4 ASP MDA  28.08.2023 7.42 20.0 176.0 58.0 5800 4300 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
77 72 MLD Garh road (Jagriti vihar) Kamalpur 2018 Meerut  72 72 SBR UPJN(U) 28.08.2023 7.48 8.0 76.0 9.0 930 780 Achieving Treated sewage by conduit and sludge to pit  River Kali (East) River Ganga Phase-I
78 10 MLD Ganga Nagar, Meerut  2011 Meerut  10 3.8 SBR MDA 28.08.2023 7.41 16.0 148.0 41.0 2500 2100 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
79 06 MLD Shradhapuri- Phase-2, Meerut  2012 Meerut  6 5.6 ASP MDA  28.08.2023 7.45 18.0 160.0 48.0 4900 4100 Not Achieving ----  River Kali (East)  River Kali (East) Phase-I
80 32.5 MLD Nagar Palika Parishad, Kidwai nagar   2002 Muzaffar Nagar  32.5 30.6 Oxidation Pond  UPJN(U) 22.08.2023 7.40 26.0 104.0 38.0 170000 110000 Not Achieving ---- River Kali West  River Hindon Phase-II
81 12 MLD Ayodhya  2014 Ayodhya 12 12 UASB UPJN(U) 21.08.2023 7.95 24.0 122.0 36.0 39000 26000 Not Achieving ---- Through Pond River Saryu Phase-II
82 6 MLD Ayodhya  2023 Ayodhya 6 4 SBR UPJN(U) 28.08.2023 7.47 9.6 76.8 22.0 94000 33000 Not Achieving ---- Sutiya drain River Saryu   ( Downstream of river) Phase-II
83 6.8 MLD, Masani, Mathura   2007 Mathura 6.8 - WSP UPJN(R)  23.08.2023 7.90 26.0 176.0 83.0 2700 930 Achieving ---- River Yamuna  River Yamuna  Phase-II
84 04 MLD Vrindavan  Near Pagal Baba Mandir, Mathura 2007 Mathura 4.0 4.0 Oxidation Pond  UPJN(R)  23.08.2023 7.80 24.0 216.0 87.0 3200 920 Achieving ---- River Yamuna  River Yamuna  Phase-II
85 08 MLD STP Near 100 Bed Hospital Vrindavan, Manth road 2015 Mathura 8.0 8.0 UASB Reacter  UPJN(U) 23.08.2023 7.70 22.0 128.0 78.0 2400 830 Achieving   River Yamuna  River Yamuna  Phase-II
86 14.5 MLD Trans-yamuna, Jamunapar, Mathura  2007 Mathura 14.5 14.5 Oxidation Pond  UPJN(R)  23.08.2023 7.80 24.0 184.0 88.0 2700 830 Achieving Agriculture  River Yamuna  River Yamuna  Phase-II
87 30 MLD Masani  Mathura  2020 Mathura 30 30 SBR UPJN(R)  23.08.2023 7.70 25.0 136.0 58.0 2500 910 Achieving Agriculture  River Yamuna  River Yamuna  Phase-II
88 16 MLD Trans Yamuna, Laxmi Nagar, Mathura  2015 Mathura 16 14.45 UASB Reacter  UPJN(R)  23.08.2023 8.00 22.0 168.0 79.0 2100 820 Achieving Agriculture  River Yamuna  River Yamuna  Phase-II
89 2.76 MLD Goverdhan STP 2011 Mathura 2.76 2.76 WSP Nagar Palika Parishad 23.08.2023 7.90 24.0 160.0 79.0 41000 14000 Not Achieving Drain River Yamuna  Phase-II
90 33 MLD Sector-54, Noida  2011 Noida  33 33 SBR Noida Authority  14.08.2023 7.68 11.0 60.0 24.0 2500 830 Achieving ---- River Yamuna  River Yamuna  Phase-II
91 25 MLD Sector-50, Noida  2015 Noida  25 25 SBR Noida Authority  14.08.2023 7.14 10.0 56.0 19.0 2500 920 Achieving ---- River Yamuna  River Yamuna  Phase-II
92 35 MLD Sector-123, Noida  2011 Noida  35 35 SBR Noida Authority  14.08.2023 7.54 12.8 76.0 33.0 1600 170 Achieving ---- River Hindon River Hindon Phase-II
93 50 MLD Sector-168, Noida  2015 Noida  50 50 SBR Noida Authority  14.08.2023 7.63 12.0 57.6 24.0 1600 240 Achieving ---- River Yamuna  River Yamuna  Phase-II
94 2.0 MLD Greater Noida Authority STP, Vill- Badalpur 2015 Greater Noida  2 1.5 SBR GNIDA 21.08.2023 7.08 7.0 24.0 9.0 1700 680 Achieving Drain For Irrigation For Irrigation Phase-II
95 15 MLD ECO tech -2 2018 Greater Noida  15 8 SBR GNIDA 21.08.2023 7.44 9.0 30.0 12.0 1600 920 Achieving Drain Hawaliya Drain  River Yamuna through River Hindon  Phase-II
96 20 MLD ECO tech -3 2018 Greater Noida  20 10 SBR GNIDA 21.08.2023 7.36 8.0 36.0 16.0 4900 920 Achieving Drain Hawaliya Drain  River Yamuna through River Hindon  Phase-II
97 137 MLD Kasana, GreaterNoida  2015 Greater Noida  137 50 SBR GNIDA 21.08.2023 7.04 10.0 32.0 12.0 2400 780 Achieving Drain Hawaliya Drain  River Yamuna through River Hindon  Phase-II
98 34 MLD Sector -50 Noida 2012 Noida  34 34 SBR Noida Authority  14.08.2023 7.38 12.0 62.4 23.0 4100 930 Achieving ---- River Yamuna  River Yamuna  Phase-II
99 54 MLD Sector- 54, Noida  2012 Noida  54 54 SBR Noida Authority  14.08.2023 7.79 9.0 52.0 18.0 1200 450 Achieving ---- River Yamuna  River Yamuna  Phase-II
100 100 MLD Sector- 168, Noida  2023 Noida  100 20 SBR Noida Authority  14.08.2023 7.84 10.0 52.8 21.0 1200 450 Achieving ---- Kundli drain  River Yamuna  -
101 80 MLD Sector- 123, Noida  2023 Noida  80 20 SBR Noida Authority  14.08.2023 7.63 11.0 72.0 28.0 1400 610 Achieving ---- River Hindon River Hindon  
102 0.805 MLD Ahara Road, Zone-A, Anoopshahar 2003 Bulandhsahar 0.805 0.4 WSP UPJN(U) 21.08.2023 7.61 28.0 160.0 86.0 3900000 2800000 Not Achieving Treated Sewage - For Irrigation & Sludge- as Manure in Agricultural Field  For Irrigation River Ganga Phase-I
103 04 MLD Narora (NGRBA) 2015 Bulandhsahar 4 3.89 SBR UPJN(R)  21.08.2023 7.48 18.0 96.0 52.0 920 540 Achieving For Irrigation For Irrigation Phase-I
104 1.75 MLD Ahara Road, (Shivanand Ashram) Zone-B, Anoopshahar 2003 Bulandhsahar 1.75 0.9 WSP UPJN(U) 21.08.2023 7.53 24.0 144.0 94.0 4600000 3400000 Not Achieving River Ganga River Ganga Phase-I
105 2.25 MLD Narora Atomic power Station Narora Township  2000 Bulandhsahar 2.25 2.25 ASP Narora Atomic power Station  21.08.2023 7.57 16.0 104.0 44.0 540 380 Achieving For Irrigation Phase-I
106  1.5 MLD Anoopshahar Zone A (NGRBA) 2016 Bulandhsahar 1.5 1.4 MBBR UPJN(R)  21.08.2023 7.41 14.0 36.0 24.0 1700 930 Achieving Treated Sewage- For Irrigation For Irrigation River Ganga Phase-I
107 01 MLD STP Zone-B Anoopshahar 2016 Bulandhsahar 1.0 1.0 MBBR UPJN(R)  21.08.2023 7.44 18.0 52.0 36.0 920 350 Achieving Treated Sewage- Ganga River River Ganga River Ganga Phase-I
108 40 MLD STP 2023 Bulandhsahar 40 15 SBR UPJN(U) 21.08.2023 7.52 12.0 44.0 28.0 540 240 Achieving        
109 24 MLD Bijnor 2018 Bijnor 24 21.41 UASB UPJN(U) 18.08.2023 8.20 10.0 48.0 28.0 1700 110 Achieving --- Hemraj Drain River Ganga Phase-I
110 58 MLD Moradabad 2018 Moradabad 58 24 SBR UPJN(R)  22.08.2023 7.36 8.8 92.0 9.0 910 68 Achieving NA Ramganga River  Ramganga River  Phase-I
111 14 MLD Benzirpur 2016 Rampur 14 - UASB UPJN(U) 22.08.2023 7.31 26.0 84.0 41.0 1400 920 Achieving   Ramganga River  Ramganga River  Phase-I
112 15 MLD
Kasganj 
31.12.2022 Aligarh 15 12 SBR UPJN(R)  18.08.2023 7.71 18.0 128.0 96.0  -  - Achieving ---- River Kali (East) ---- ----
113 24 MLD  Manpur Etah - Aligarh  24 7.42 SBR UPJN(U) 18.08.2023 7.76 20.0 126.0 90.0  -  - Achieving ---- Bhadon Nala to Ishar River ---- ----
114 8.95 MLD Pratapgarh 2023 Pratapgarh 8.95 - FAB UPJN(U) 18.08.2023 8.32 20.0 115.2 64.0 3400 920 Achieving   Sai River